{"id":66,"date":"2023-05-14T10:03:34","date_gmt":"2023-05-14T08:03:34","guid":{"rendered":"http:\/\/smjestaj-test.test\/about-us\/building-staking-out-survey\/"},"modified":"2026-08-15T09:45:33","modified_gmt":"2026-08-15T07:45:33","slug":"building-staking-out-survey","status":"publish","type":"page","link":"https:\/\/www.geodet-split-tahimetar.hr\/en\/about-us\/building-staking-out-survey\/","title":{"rendered":"Building Staking-Out Survey"},"content":{"rendered":"<p>Before construction begins, each structure must first be staked out on site according to the Main Design to ensure construction starts within permitted boundaries.<\/p>\n<p>Before staking out, our surveying expert first checks boundary conditions in the field. After that, we prepare and certify a staking-out survey with a staking sketch and issue a confirmation that the structure was staked out according to the Geodetic Project.<\/p>\n<p>The price of staking-out depends on the object size and complexity. For pricing, contact us by phone, e-mail, or visit our office in person.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before construction begins, each structure must first be staked out on site according to the Main Design to ensure construction starts within permitted boundaries. Before staking out, our surveying expert [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":31,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-66","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/pages\/66","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/comments?post=66"}],"version-history":[{"count":0,"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/pages\/66\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/pages\/31"}],"wp:attachment":[{"href":"https:\/\/www.geodet-split-tahimetar.hr\/en\/wp-json\/wp\/v2\/media?parent=66"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}